How do you measure portfolio heat across perpetual positions?

Portfolio heat is the sum of the planned losses attached to open positions, expressed as money or a share of account equity. For a conservative entry decision, also reserve risk for pending orders that could fill. Keep a separate stress scenario for worse fills and correlated moves: stop-based heat is a planning total, not a guaranteed maximum account loss.

What exactly goes in the heat ledger?

For this worksheet, measure each open position's planned price loss from average entry to its current protective stop. Count adverse amounts only; do not subtract another position's unrealized gains to create extra entry capacity. Record realized results elsewhere. This is a deliberately conservative admission rule, not a liquidation model or exchange margin calculation.

Fields: pair, direction, quantity, average entry, stop, planned price loss, cost reserve, and pending-entry risk. Record account equity at a stated time so the percentage denominator is unambiguous. Risk management explains the single-trade inputs; portfolio management introduces allocation across strategies.

What does a three-order ledger look like?

Arithmetic illustration only. Equity is 2,000 USDT. A written heat ceiling is 2% of that reference equity, or 40 USDT. It is a sample rule, not a recommended universal ceiling.

Arithmetic illustration only.
Item State Planned price loss
BTC USDT perpetual long Open, 0.02 BTC, entry 60,000, stop 59,500 0.02 × 500 = 10 USDT
ETH USDT perpetual long Open, 0.2 ETH, entry 3,000, stop 2,950 0.2 × 50 = 10 USDT
Another crypto USDT perpetual entry Pending, sized to a 15-USDT stop loss 15 USDT if filled

Open price heat = 20 USDT. Including the pending instruction gives committed price heat = 35 USDT. That is 35 / 2,000 × 100 = 1.75%. A new order risking 10 USDT would raise it to 45 USDT, or 2.25%, above the example ceiling even before a cost reserve. Having unused margin does not make the order fit the risk budget.

How should costs and stressed fills be separated?

Suppose the worksheet reserves 1 USDT for costs on each of the three commitments. Committed budget becomes 35 + 3 = 38 USDT, leaving 2 USDT within the 40-USDT ceiling. Those reserves are hypothetical cash amounts, not fee schedules.

Separately suppose stressed exit execution makes each price loss 1.5 times its planned amount. Stress loss = 1.5 × 35 + 3 = 55.50 USDT, or 2.775% of reference equity. This is one selected scenario, not an estimate of the probability or a worst-case bound. Stops can fail, margin conditions can change, and losses can exceed it.

Why do correlated positions need a shared scenario?

Different ticker names do not establish independent risks. Several crypto longs may react to the same market move. Do not apply a diversification discount merely because there are three rows. Test the possibility that all adverse exits happen together, then ask whether the account can tolerate that path.

A historical correlation estimate depends on timeframe, sample and conditions. It does not cap future co-movement. This worksheet uses no claimed correlation coefficient and no claim that particular pairs always move together. If you hold offsetting directions, include basis changes, unequal sizes and execution timing in the scenario rather than assuming gains and losses cancel.

When should the ledger be updated?

After any fill, partial exit, stop change, new pending entry or confirmed cancellation. A favorable moved stop does not remove gap risk. Recompute using final quantity and actual protection; partial fills explains the difference between present and pending exposure.

Use the stricter of the portfolio ceiling and the remaining daily loss budget. Passing one does not override the other. Never move a stop simply to make the spreadsheet pass. The ledger's job is to reject excess commitments before they become positions.

What are the short answers on portfolio heat?

Is portfolio heat the same as margin used?

No. This worksheet sums planned losses at protective stops, while margin is collateral supporting positions. Available margin does not establish spare risk capacity.

Should pending entry orders count?

Yes, for a conservative admission decision. Reserve their planned risk while they can still execute, and release it only after the relevant cancellation or expiry is confirmed.

Does spreading orders across crypto pairs guarantee diversification?

No. Several pairs can react adversely at the same time. Test a shared scenario without assuming a diversification discount or a guaranteed loss bound.

Leveraged futures carry a high risk of loss.

Last reviewed by Ric Mescallado